Link Details

Link 797827 thumbnail
User 225256 avatar

By mswatcher
via reliablesoftware.com
Submitted: May 25 2012 / 12:18

To avoid a single point of failure you needed to have redundancy. There are several power lines between a power station and a customer. When an overload is detected by a circuit breaker, power can be rerouted along another line. Each individual line is normally run at reduced capacity so it can handle the increased load.
  • 2
  • 0
  • 230
  • 16

Add your comment


Html tags not supported. Reply is editable for 5 minutes. Use [code lang="java|ruby|sql|css|xml"][/code] to post code snippets.

Voters For This Link (2)



Voters Against This Link (0)



    Apache Hadoop
    Written by: Piotr Krewski
    Featured Refcardz: Top Refcardz:
    1. Play
    2. Akka
    3. Design Patterns
    4. OO JS
    5. Cont. Delivery
    1. Play
    2. Java Performance
    3. Akka
    4. REST
    5. Java