DZone
Thanks for visiting DZone today,
Edit Profile
  • Manage Email Subscriptions
  • How to Post to DZone
  • Article Submission Guidelines
Sign Out View Profile
  • Post an Article
  • Manage My Drafts
Newsletter
Log In / Join
Refcards Trend Reports
Events Video Library
Refcards
Trend Reports

Events

View Events Video Library

Related

  • Your Visual Regression Suite Is Mostly Testing Anti-Aliasing
  • A Practical Pipeline for Identifying Sensitive Columns Before Test Data Masking
  • How to Build a Solid Test Pipeline in the Era of Agentic AI Development
  • Automating FastAPI Deployments With a GitHub Actions Pipeline

Trending

  • Designing Memory Architecture for Stateful AI Agents: Short-Term Context and Long-Term Persistence
  • The Art of Idempotency: Preventing Double Charges and Duplicate Actions
  • Picture Perfect: Choosing Your Featured Image
  • Java 27 Makes G1 the Default Everywhere: How to Test Your Small Containers Before You Upgrade

Draft This article hasn't been published, so readers can't see it.

In moderation This article is waiting for review, so readers can't see it yet.

Deleted This article has been deleted, so readers can't see it.

  1. DZone
  2. Testing, Deployment, and Maintenance
  3. DevOps and CI/CD
  4. Shift-Left QA With Octopus Deploy: Orchestrating Katalon Tests in Your Pipeline

Shift-Left QA With Octopus Deploy: Orchestrating Katalon Tests in Your Pipeline

Integrate Octopus Deploy with Katalon to automate UI and API testing, gate releases, publish reports, and improve deployment reliability across environments.

By 
Shalini Sudarsan
·
Feb. 11, 26 · Tutorial
Post on X (opens in a new tab) Share on LinkedIn (opens in a new tab)
1.8K Views

Join the DZone community Save articles, join the discussion, and download Refcards and Trend Reports with a free account.

Join for free Already a member? Log in

Octopus Deploy is helpful in planning releases and runbooks across multiple environments. Integrating Katalon with the Katalon Runtime Engine (KRE) and TestOps provides strong, scriptable UI and API testing, reporting, and team workflows. Combining these approaches will allow us to improve release cycles through automated testing, publish artifacts to a single repository, and fail fast when quality is compromised.

There are two possible ways of integration:

  1. Triggering the tests from Octopus into the continuous integration (CI) system, such as an AWS CodeBuild project that runs Katalon. This is the simplest path and requires minimal Docker setup and Infrastructure-as-Code (IaC) work.
  2. Run KRE directly in the deployment pipeline using containers, shared test content, and environment-specific profiles, so releases and test execution happen side-by-side with explicit IaC flags and versioning.

Prerequisites

  • Octopus Project and Environments configured for your app/service.
  • Katalon Runtime Engine (KRE) is licensed and accessible in the runner (CI or container).
  • Katalon TestOps project with profiles per environment and Test Suites for the pipeline. 
  • (Option A) AWS CodeBuild project that calls Katalon (or a wrapper script) and publishes reports to TestOps. 
  • (Option B) Container image(s) for KRE in ECR and test content in EFS (or another artifact store) with IaC wiring.

Option A: Trigger Katalon via CI From Octopus (Quickest Win)

When to use: You already have Katalon jobs in CI and want Octopus to gate deployments by calling those jobs.

Step-by-Step

1. Create an Octopus step (Run a Script or a community step) that calls your CI API (AWS CodeBuild, Jenkins, etc.), by sending the required details as parameters:

  • Environment (maps to Katalon Execution Profile)
  • Test suite (e.g., a smoke test suite)
  • Release version/build number.

The figure below shows the project dashboard in Octopus UI.

Project dashboard snapshot in Octopus

Fig. 1: Project dashboard snapshot in Octopus


2. Operator flow (from the guide):

  • Open the Octopus project (e.g., <project name> → Katalon Build Trigger) as shown in Fig 2, choose your environment, and deploy. If you see a green checkmark, select “Re-deploy” from the ellipsis. The guide also shows “Expand All,” pick Execution Profiles/Test Suites, then Deploy. 

Snapshot of choosing the parameters set in step 1

Snapshot of choosing the parameters set in step 1

Figs. 2 and 3: A snapshot of choosing the parameters set in step 1


3. Observe in AWS:

  • Navigate to Developer Tools → CodeBuild, switch region if needed, and track the Build_Services project in In Progress/Succeeded status. The guide’s screenshots show searching projects, opening Build history, and drilling into Phase details for verbose logs. Below are snapshots (Figs. 4 and 5) of the AWS console showing the different states explained here.

Build services showing status of jobs

Fig. 4: Build services showing the status of jobs


Summary of different state of jobs

Fig. 5: Shows the summary of different states of jobs

4. Final reports appear in Katalon TestOps as shown in Fig. 6.

Final reports in Katalon

Fig. 6: Final reports in Katalon


Option B: Run KRE Inline in the Octopus Pipeline (Maximum Control)

When to use: You want tighter coupling of deployments and tests, version-pinned KRE images per environment, and IaC-driven toggles.

Core Design (From the Pipeline Concept)

  • KRE container builds are versioned in ECR to match KRE versions.
  • Katalon test files sync to EFS (e.g., via a Lambda trigger on main merges).
  • TestOps is prepped with Profiles & Suites per workspace/environment.
  • IaC tfvars supply:
    • katalon_runtime_engine_version
    • run_tests = true|false
  • Deploy flow:
    1. After app infrastructure changes, deploy the KRE container.
    2. Mount the EFS path with the latest tests for that environment.
    3. Execute the Katalon run command with the selected profile and suite.
    4. Send results to TestOps (and optionally a team dashboard). 

Architecture flow of integrating Katalon through KRE

Fig. 7: Architecture flow of integrating Katalon through KRE


Reports, Artifacts, and Dashboards

  • Katalon TestOps receives the run, history, and trends; the runbook’s screenshots show how a Test Run report appears after CodeBuild runs. See the report snapshot in Fig. 6. 
  • If you store JUnit/HTML outputs in a known path (/tests/Reports), configure your Octopus step to collect artifacts so they’re visible from the release page.
  • For inline KRE, you can publish a summary markdown to the Octopus output and a link to the TestOps run.

Optional: Add a Lighthouse performance gate from Katalon

If you’re deploying web apps, you can launch Google Lighthouse from Katalon and treat performance/SEO as first-class gates. The how-to document provides:

  • CLI flags to run Lighthouse headlessly or in desktop/mobile modes, with guidance on conflicts (e.g., don’t combine --preset=desktop with --form-factor=mobile). 
  • A full Groovy script to run Lighthouse from Katalon, parse JSON, check thresholds, and mark the build PASS/FAIL — handy to wire into the same Octopus step. 
  • Practical tips and troubleshooting (version checks, headless mode, debug flow). 

Example thresholds (tune to your risk appetite):

  • Performance ≥ 80
  • Accessibility ≥ 85
  • Best Practices ≥ 90
  • SEO ≥ 75

The report can be saved as JSON and attached as an Octopus artifact.

Operational Tips and Guardrails

  • Start with smoke tests: Time-bounded suites (<5–10 min) keep deployments fast. The internal guide demonstrates a smoke-first approach. 
  • Pin KRE versions: Build and tag ECR images with explicit KRE versions, so upgrades are controlled per environment. 
  • IaC switches: Add a run_tests tfvar and enforce it in your Octopus variable scoping to enable/disable gates per lifecycle. 
  • Make failures obvious: Map non-zero exit codes to step failure; attach summarized HTML/JUnit; link to TestOps.
  • Keep logs searchable: CI/CodeBuild shows granular phase logs; use them when diagnosing flaky tests or environment drift. 

Conclusion

By letting Octopus call Katalon (and optionally Lighthouse) as first-class release steps, you transform your pipeline from “deploy-and-fingers-crossed moments” to deploy-and-verify. Start simple by triggering CI for smoke tests, then gradually evolve toward inline KRE with versioned containers, IaC toggles, and performance gates. The result is faster feedback, repeatable quality, and a release process that the engineers would trust.

Octopus (software) Pipeline (software) Testing

Opinions expressed by DZone contributors are their own.

Related

  • Your Visual Regression Suite Is Mostly Testing Anti-Aliasing
  • A Practical Pipeline for Identifying Sensitive Columns Before Test Data Masking
  • How to Build a Solid Test Pipeline in the Era of Agentic AI Development
  • Automating FastAPI Deployments With a GitHub Actions Pipeline

Partner Resources

×

Comments

Loading comments

The comments didn't load

Please try again in a moment.

Likes

Loading

The next likes didn't load. Please try again.

The likes didn't load

Please try again in a moment.

See who liked this

Log in or join DZone for free to see who liked this article.

Log in Join for free
  • RSS
  • X
  • Facebook

ABOUT US

  • About DZone
  • Support and feedback
  • Community research

ADVERTISE

  • Advertise with DZone

CONTRIBUTE ON DZONE

  • Article Submission Guidelines
  • Become a Contributor
  • Core Program
  • Visit the Writers' Zone

LEGAL

  • Terms of Service
  • Privacy Policy

CONTACT US

  • 3343 Perimeter Hill Drive
  • Suite 215
  • Nashville, TN 37211
  • [email protected]

Let's be friends:

  • RSS
  • X
  • Facebook